Each quote covers different work
One allows for the retaining wall. One leaves it out. One sets aside a rough figure.
The page changes to suit your questions and your next step.
Every builder prices to their own assumptions, so no two quotes cover the same work.
One allows for the retaining wall. One leaves it out. One sets aside a rough figure.
Three formats, three sets of inclusions, and no way to tell which number is complete.
The cheapest quote is usually the one that left the most out. The rest arrives later, at a price nobody competed on.
The fix
One scope of works,priced by every builder.
Four steps. You do the first one, we do the rest.
Start with your plans.
Your drawings, your reports, whatever your designer gave you. Add a few details about the project and that is your part done. Everything after this is ours.
Your plans become one scope.
We read every drawing, report and specification, and write out every item of work they cover. Every scope item points at the page it came from. You approve it before any builder sees it.
Every builder prices that scope.
Verified builders walk your scope line by line and answer the same questions under signature. Nobody quietly leaves an item out, and nothing turns up later as a variation you never agreed to.
See what each price actually covers.
We read every tender in full and set out where they differ, item by item: what each one has allowed for, what it has left out, and where the money can still move. Then you choose.
Nobody prices your job anonymously. Every builder is vetted before they see it, and the rules they price under are published before the round opens.
We check each builder’s ABN against the Australian Business Register, and their licence against the state register where one connects and by our team where it does not. A builder takes a spot on an open round only once both have passed. Insurances are declared under signature with the tender.
Each line points to the document, page and revision it came from, and anything we cannot trace is removed. The pack cannot be approved while anything is unread, and nothing reaches a builder until you approve it.
Every tender is read against the same six things: how firm the price is, how much of the scope it covers, how well it is prepared, who the builder is, how they deliver, and how believable the programme is. Each one shows its working, so you can see why one tender sits above another.
The contract is signed directly between you and your builder.
Our Preferred Partner register covers building designers, builders and finance brokers we know and work with. Tell us what you need and we will point you to the right one. No fee to be introduced.
One platform, where Australia’s residential builds get organised.
Homeowners
bring the project
Plans in, tenders back, compared properly.
Building designers
bring the design
Tenders run under the practice’s name.
Builders
bring it to life
One list to price, no commission.
Finance brokers
back the build
Introduced when a client needs lending.
A BuilderHQ publication
The Build Brief
A short weekly read on the economics of getting homes built in Australia. Plain language, every figure attributed to its source, and no opinion dressed up as news.
Inflation rose more than the RBA expected, ahead of its 3 November cash rate decision.
Trimmed mean inflation rose 1.0% in the September quarter. Economists say the Reserve Bank's August forecasts implied about 0.8%. The four major banks now forecast a cash rate rise, and the RBA will announce its decision on Tuesday 3 November.
Read this issueIf yours isn’t here, email info@builderhq.com.au and a human answers.
Upload your plans and find out what each builder has actually allowed for.